Files
Reactive-Resume/docs/guides/entering-dates.mdx
T

115 lines
5.7 KiB
Plaintext
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
title: "Entering dates"
description: "Type start and end dates, year-only dates and current roles in Reactive Resume, fix dates that need a look, and choose how every date prints."
---
Dates in Reactive Resume are structured: you type a month and year (or only a year), and the resume prints every date in one consistent format that you choose. This keeps your resume tidy, lets **Sort by date** work, and helps applicant tracking systems read your timeline.
## Enter dates for an entry
Experience, Education, Projects and Volunteer entries have a start and an end date. Each job role has its own pair too.
<Steps>
<Step title="Open the entry">
In **Write** mode, open the entry you want to date. See [Editing entries](/guides/editing-entries) if you're not
sure how.
</Step>
<Step title="Type the start date">
In the first box under **Dates**, type the date the way you normally write it, for example `Mar 2022`, `March 2022`,
`03/2022`, `2022-03`, or only `2022`. A date that can be read saves as you type. When you leave the box, it switches
to your resume's date format.
</Step>
<Step title="Type the end date, or turn on Present">
Type the end date in the second box. If you're still in the role or still studying, turn on **Present** instead. The
end box then shows the word "Present" and can't be edited.
</Step>
</Steps>
<Frame caption="A current role: the start date and Present">
<img
src="/images/guides/entering-dates/dates-present.webp"
alt="The Dates field with Mar 2022 in the start box, the end box greyed out showing Present, and the Present switch turned on."
/>
</Frame>
Awards, Certifications and Publications have a single **Date** box and no Present switch.
## Year-only dates
If you don't remember the month, or prefer not to show it, type only the year, such as `2014`. Year-only dates are exact, not guesses: they print as the year alone whatever date format you choose, for example "2014 – 2018".
## How dates print
The page shows the start and end joined by a dash. If there's only a start date, only that date prints; with **Present** on, the end reads "Present".
<Frame caption="Dates on the page: year-only for Education, month and year with Present for Experience">
<img
src="/images/guides/entering-dates/dates-on-page.webp"
alt="The Education section showing University of Washington with 2014 – 2018, and the Experience section showing Cascade Studios with March 2022 – Present and two roles with their own dates."
/>
</Frame>
Month names and the word "Present" follow the resume's language, which you set in **Design** → **Page** → **Language**. For example, a resume in German prints "März 2022 – Heute". You can also type month names in the resume's language.
## Choose the date format
<Steps>
<Step title="Open Advanced in Design mode">
Select **Design** in the editor bar, then open **Advanced** at the bottom of the panel.
</Step>
<Step title="Pick a date format">
Choose one of the four formats in **Date format**. Every date on the resume changes at once.
</Step>
</Steps>
<Frame caption="The Date format setting in Design → Advanced">
<img
src="/images/guides/entering-dates/design-advanced-date-format.webp"
alt="The Advanced group in Design mode, with a Date format dropdown set to March 2022."
/>
</Frame>
| Option | Prints as |
| -------------- | --------------------------------------- |
| **Mar 2022** | Short month name and year (the default) |
| **March 2022** | Full month name and year |
| **03/2022** | Month number and year |
| **2022-03** | Year and month number (ISO) |
Resumes brought over from an earlier version of Reactive Resume start with whichever of these formats is closest to how their dates were typed. **Reset design defaults** in the same panel doesn't change your date format.
## Fix dates that need a look
The Dates field tells you when something is off.
- **"This date has not been saved."** The text you typed cannot be read. Correct it using a month and year, such as Mar 2022, or only a year. The page keeps the last readable date until then.
- **"The end is before the start."** The two dates are the wrong way round. Swap them, or the entry sorts to the end when you use **Sort by date**.
<Frame caption="A date that can't be read">
<img
src="/images/guides/entering-dates/dates-unreadable-error.webp"
alt="The Dates field with Spring typed in the start box and 2024 in the end box, and a red message below: Use a month and year, like Mar 2022, or just a year."
/>
</Frame>
### Dates from imports and older resumes
When you import a resume, or open one made before dates were structured, Reactive Resume converts each date from its text. Dates it can't read exactly, such as "Summer 2016", are flagged:
- The section's row in the list shows a **to check** badge with the number of entries to look at.
- The entry's Dates field explains what happened, for example: We read "Summer 2016". Pick a month so it sorts and prints consistently.
- Until you edit the dates, the entry prints the original text as it was written.
Type the dates, or change any part of them, and the note clears.
<Note>
**Check** mode also flags entries without dates, dates that can't be read, dates that run backwards and dates in the
future. See [Checking your resume](/guides/checking-your-resume).
</Note>
## Related guides
- [Editing entries](/guides/editing-entries): the other fields in each entry, including job roles.
- [Managing sections](/guides/managing-sections): sort Experience and Education by date from the section menu.
- [Importing resumes](/guides/importing-resumes): bring in an existing resume and review what was read.