Files
Reactive-Resume/.github
Amruth Pillai 1106562169 test(pdf): refresh Lapras date-layout baseline and run all packages in CI
The Lapras section marginTop added in c0c658c0 shifted every date marker in
that template down the page, but the date-layout characterization baseline
was not regenerated, so packages/pdf has been failing on main since. The
delta is geometry-only: same page count (2), same text item count (87), same
markers, x and width unchanged; 17 markers move on y and the raster hashes
follow.

Nothing caught it because the workflow ran test:ci for only server and
tooling, leaving 17 packages uncovered. Replace that filter list with the
full workspace run so a package cannot silently lose coverage again, and
move it after the migration and storage steps that the api suite needs.

Serial execution is deliberate. Running the packages in parallel oversubscribes
the runner and starves the PDF rasterization and API rate-limit suites past
their timeouts; 19/19 pass consistently at --concurrency=1.
2026-09-09 12:33:04 +02:00
..
2026-08-24 21:44:16 +02:00